Battersea Power Station

«»

Page : 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48ALL

day. Once the water had been through the stations’ systems, the water was cooled and discharged back into the river.

The waste heat of the water was also implemented in a district heating scheme. After the end of the Second World War, the London Power Company took the opportunity to introduce the new innovation in the Battersea station. A district heating scheme (better known now as “cogeneration”) benefitted some 10,000 people. It provided hot water and central heating to newly redeveloped areas within Pimlico, on the opposite side of the river.

Scrubbers

The reduction of sulphur emissions had been an important factor since the station was in the design stages, as it was one of the main worries of those who protested the construction of the station. The London Power Company began developing an experimental technique for washing the flue

Page : 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48ALL

Pages: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48

Get the book now