Battersea Power Station
Page : 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48ALL
time, providing a fifth of London’s electricity needs. It was also the most thermally efficient power station in the world when it opened.
The A Station had been operated by the London Power Company, but by the time the B Station was completed, the UK’s electric supply industry had been nationalised, and ownership of the two stations had passed into the hands of the British Electricity Authority in 1948. In 1955, this became the Central Electricity Authority, which in turn became the Central Electricity Generating Board in 1957.
On 20 April 1964, the power station was the site of a fire that caused power failures throughout London, including at the BBC Television Centre, which was due to launch BBC Two that night. The launch was delayed until the following day at 11am.
Design and specification
Both of the stations were designed
Page : 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48ALL
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48